SolarEdge has developed a smart inverter solution that changes the way of energy management in photovoltaic systems. The inverter system with optimizers maximizes the energy production at the single module
Fronius: 24 hours of sun
A world of 24 hours of sun: the vision of Fronius is to manage the energy production by renewables in order to cover the full day needs of energy in
Plan for a green energy in France
The plan for green energy in France could be improved a lot the actual situation for this country in the energy sector. In fact, France, despite a big potential, during
In Madrid, LG Solar awarded VP Solar
The annual meeting with LG Solar and the main European dealers took place on 21st and 22nd February. Over these days, the new forecasts of the photovoltaics market were highlighted
A++ Moody’s rating to VP Solar
On the 24th of January 2018 the highest Moody’s rating (A++) has been assigned to VP Solar, by Credit Passport®.A++ rating means “Excellent Credit Quality” and the report indicates the
Q.PRO technology from Q CELLS
In February 2015 Hanwha Q CELLS Co., Ltd. (NASDAQ: HQCL) has emerged as a new global leader in solar energy by combining two of the most famous photovoltaic manufacturers in
Kioto Solar modules Pure 60 mono and polycrystalline
Kioto Solar, Austrian leader company in the solar energy and energy efficiency market for 25 years, boasts a production capacity of 150 MW of photovoltaics. KIOTO Photovoltaics produces high quality
Panasonic Solar Panels
Panasonic’s quality of solar panels comes from a forty-year experience in the photovoltaic industry. Panasonic Solar Panels: decades of development Already in the early 1980s Sanyo (old brand with which
ABB FIA Formula E
The ABB FIA Formula E® is the worldwide championship of electric single-seater car (the equivalent of Formula 1). It started in 2014, inspired by the FIA president Jean Todt and
Tigo platform and SMA: module level monitoring
SMA through the Tigo platform meets all system requirements, whether it is simple monitoring at the module level but also shutdown it for security reasons imposed by firefighters but even